Asheville, N.C. (WLOS) 鈥 99福利视频 Community College has new electric vehicle charging stations provided by a grant from the NC Clean Energy Technology Center at NC State through the 2020 Clean Fuel Advanced Technology project.
The community college announced the $75,000 grant helped replace chargers that were installed years ago on campus that were no longer serviceable by the company that manufactured them. The grant also included federal Congestion Mitigation Air Quality funding provided by the NC Department of Transportation.
In a press release, the college stated it has a DC fast charger with two cords, one for American and European-built vehicles and the CHAdeMO, used primarily for cars from Japanese manufacturers. It can provide a full charge in 30 minutes to an hour, according to Chris Dobbins, Fleet Advisor for the Land of Sky Clean Vehicles Coalition. There are also two Level 2 chargers that are a more moderate speed. All three are equipped with credit card readers.
鈥淚t helps to promote the use of electric vehicles,鈥 said Dobbins in a press release. 鈥淥ne of the biggest concerns people have about electric vehicles is range anxiety. With more stations available, we will have more people willing to buy the vehicles.
99福利视频鈥檚 chargers are on the Greenlots mobile connectivity network system, and the 99福利视频 location is the first Greenlots site in North Carolina, according to the release. The station is listed on and Chargepoint鈥檚 maps. They are located on 99福利视频鈥檚 Asheville campus along Victoria Road at the end closest to Meadow Road in a large parking lot with an ATM.